fire-tube boiler, one condensing/extraction steam turbine, an electric generator, two auxiliary pumps, a deaerator and a close water-cooling system (Fig. 1). Simulations were performed using GateCycleTM software that is a PC-based software application used
Read MoreConsider the system shown in Figure 10.2.6, and determine the pipe size required from the boiler to the unit heater branch line. Unit heater steam load = 270 kg/h. Although the unit heater only requires 270 kg/h, the boiler has to supply more than this due to
Read MoreA steam locomotive is a rail vehicle that provides the force to move itself and other vehicles by means of the expansion of steam.[1]: 80 It is fuelled by burning combustible material (usually coal, oil or – now rare – wood) to heat water in the locomotive's boiler to the point when it becomes gaseous and its volume increases 1700 times.
Read MoreThe hybrid membrane system supplies 70 m 3 /h high purity water to the steam generator with resistivity greater than 10.0 MΩ-cm, and silica less than 10 ppb. Reusing reclaimed water reduces the power plant's dependence on potable water, and saves the local community nearly 2200 m 3 …
Read More1/1/2016 · Extra boiler capacity may be needed to guarantee supplying the steam demand in process, because part of the steam will supply, in this case, electricity generation. The extra capacity in CHP is 7800 MW and 10,000 MW heat capacity.
Read More